Wednesday, February 18, 2009

Retaining Wall

Crews work to construct a retaining wall on the outer
perimeter of the future parking lot at the Ipswich Ale Brewery
















In the News

Check out this article in the Boston Business Journal about
the Ipswich Ale Brewery!
Released last Wednesday February 11th

http://boston.bizjournals.com/boston/stories/2009/02/09/daily41.html

Friday, February 13, 2009

Front Door

Future site of the front door of the
Ipswich Ale Brewery!


Steel Beam

Moving of the steel beam





Jay Caram cuts the beam to length






















Beam fitted in place in it's final location









Thursday, February 12, 2009

Foundation

Foundation for the Brewhouse



































Tuesday, February 10, 2009

Perspective

Perspective

Just to get an idea of how big the equipment we are using is, compare
it to the dumptruck pictured below, and the bobcat in the next photo.











Below is the equipment inside the basement of the building.
The size of the basement actually makes the bulldozer
look much smaller than it really is!!



















Monday, February 9, 2009

Snow Storm

Demolition crews press on through last
Tuesday's snow storm, continuing to knock
down the left portion of the building



























Interior Demo

Interior Demolition:
Demolition crews rip apart the basement of the building
Taken February 3rd, 2009